Manufacturer/Factorys, Trading Company
Wuhan Dewei Electrical Test Equipment Co., Ltd.
Claim Your Company
China,Nanjing
Average Lead Time: Peak season lead time: one monthOff season lead time: within 15 workdays days
Annual Revenue: confidential
Membership Year: 2011
Plant Area:
1,000-3,000 square meters
Accepted Payment Modes:
USD, EUR, JPY, CAD, AUD, HKD, GBP, CNY, CHF
Certification:
ISO 9001, ISO 9000, ISO 14001, SA 8000, HACCP..., CE
Main Products:
Room Thermostat , Motorized Valve
<p class="intro-cnt J-txt-cnt">
Wuhan Dewei Electrical Test Equipment Co., Ltd. Was founded in 2003. We are engaged in manufacturing, researching and design various test systems of electrical equipment(such as transformer, reactor, switch, instrument transformer, insulator, lightning arrester, capacitor, etc). <br><br>The test systems customized are including transformer loss and temperature rising test system, transformer inductive withstand voltage&partial discharge test system, power frequency withstand voltage& partial discharge test system, lightning impulse current&voltage test system, high current&temperature rising test system, etc. <br><br>We have successfully delivered our test equipments to some of important project, such as The Three Gorges Hydropower Station, Daimler Benz, , Siemens(Wuxi, China) Co., Ltd., Shandong Electrical Engineering & Equipment Group Co., Ltd., TBEA, State Grid, CHANGZHOU Toshiba TRANSFORMER COMPANY LIMITED., Jiangsu NARI Power Electric Co., Ltd., NORTON ELEKTRONIK SAN VE TIC Ltd STI, Electrical laboratory of Tsinghua University, Tatung Co., etc.
</p>