Ascot Resources Ltd.
Ascot Resources Ltd. holds a 100% interest in the Swamp Point Aggregate Mine located on the Portland Canal in Northern Briish Columbia Canada. The project was fully permitted as a gravel quarry operation by the Government in 2006. The project has been developing since that time. See website at, The project is on tidewater and easily accessable to the Pacific ocean water routes. A deepwater dock is under construction capable of handling up to Panamax sized vessels. A barge loading facility has been completed. The ship dock has capacity to load at 5000 tonnes per hour using 2 Telestack conveyor systems. A year round camp has been completed on site and is accessible by water or air from Prince Rupert or Stewart This project has low environmental impact.MANAGEMENTJohn Tofan - PesidentBob Evans - CFOken Carter - DirectorBruce MacLean - Interim Mine Manager
Trade Capacity
| 420-475 howe st. |
| Response Rate | Response Time | Rating | Reviews |
|---|---|---|---|
| 50% | 24h-48h | 2.8/5 | 89 Reviews |


