div header bar
ExportHub
icon-left
ExportHub
icon-right

Ess (energy Storage Systems) Prototype Pcb Assembly - Grande Electronics

Selling Price: USD 2 / Cubic Meter
Minimum Order Quantity:  1 Cubic Meter
Shipment Delivery Time:  15 days
Shipment Port:  Shenzhen Port
Currency Options:  USD
Language Support:   English, Chinese
Certification:  Inquire
Production Capacity: 1000000000 Cubic Meter
Primary Business:  Manufacturer
Packaging:  Static bag packaging
Preferred Payment Method:
ESS (Energy Storage Systems) Prototype PCB Assembly - Grande Electronics Details

[Description]
1, Turnkey solution for ESS (Energy Storage Systems) Prototype PCB Assembly - Grande Electronics
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.
3,  Full Bespoke PCBA/ OEM/ EMS(Electronics Manufacturing Services).
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, ICT and Functional Circuit Test.
8, Sample and small batch order are accepted.

PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed. 
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing

 

 

About Shenzhen Grande Electronics Co., Ltd.
Business Type: Manufacturer
Country / Region: Guangdong, China
Main Products: Pcb & Pcba...
Total Annual Revenue: US$1 Million - US$2.5 Million
Year of Establishment: 2023
Business Nature

Manufacturer

Year Established

2023

Annual Turnover

US$1 Million - US$2.5 Million

Country/Region

Guangzhou, China

Main Products

Pcb & Pcba...

Legal Status

PCB&PCBA

Payment Terms

Bank wire (T/T)

About Shenzhen Grande Electronics Co., Ltd.

One Stop PCBA

Send Your Inquiry Direct To This Supplier

To: Ess (energy Storage Systems) Prototype Pcb Assembly - Grande Electronics
From China
Free Member
Business Type:
Manufacturer
Rating:
Not Available
Response:
71%
Transactions:
Not Available
Room A510, Automobile Mansion, No.45 Zhenhua Road, Futian District , Guangdong , Guangzhou , China

Contact Shenzhen Grande Electronics Co., Ltd.

Success!!Your message has been sent successfully.

Success!!Your enquiry successfully sent.

Loading

Your message has been sent successfully.

* By joining ExportHub, I agree to Terms, Privacy Policy, IPR/DMCA Policy and Marketing Policy of ExportHub

Submitting...
ExportHub Virtual Expo
Scroll to Top