Get Quick Quote From Supplier
Hi,My name is Mohammed Gadallah, Proposal & Tender Manager of EMCO engineering Group, Water & Waste water treatment Co., Dubai. UAEmy E-Mail: *******@*****.com looking for a cooling tower to serve as a pre cooling before RO system, Flow Rate : 280 m3/hr of Brackish Water with 2200 PPM TDSfeed temp: 65 ~ 70 Deg. Cout temp: 30 ~ 35 Deg. Cpower availability: 220 /380 V. 3PH. 60 Hz