Entered incorrect captcha

loading arms

  • Sourcing Country:PakistanPakistan
  • Required Quantity: Ask From Buyer
  • Posted Date:10 Jun 2025
  • Expiry Date:22 Aug 2025
  • Buyer Name: pk sales 083852
  • Usage:
    Ask From Buyer
  • Buying Frequency: One Time
  • Approx Order Value:
    Ask From Buyer
  • Quotations Received: 13 Quotes
  • FOB Price:
    Ask From Buyer
  • Time Left: 49 Days
  • Shipping Terms:
    Ask From Buyer
  • Payment Terms: T/T, LC, D/P, PayPal, Western Union
  • Preferred Supplier Country:ChinaChina

RFQ Description

Dear Sir, Please quote price for following loading arm: Loading arm 4 dia complete setQTY: 08 NOS. OPERATING CONDITIONS: Fluids: Refined liquid petroleum products such as Gasoline, Diesel, Furnace Oil, JP-1, JP-4 Kerosene etc.Service Temperature: -5 to 50 degree CelsiusWorking pressure: Maximum 5 BARFlow Rate: 2250 Ltr /min LOADING ARM SPECIFICATIONS: TYPE: Top Loading Arm, Balanced with Torsion Spring, Right hand configurationDiameter of loading arm: 4 (dn 100mm)Inlet Flange: 4 ANSI 150 lbs. raised face (upright inlet), flat face also acceptable.Inlet swivel: consisting of one vertical and one horizontal plane of rotation.Onto this swivel the torsion spring balance will be mounted.Intermediate Swivel: consisting of one horizontal plane of rotation.Drop tube Swivel: consisting of one vertical plane of rotation.Loading Valve: Hold Open Cam type with extension control (which allows the operator to open and close the valve while standing on the tank truck.)DIMENSIONS:Primary Arm Length: 2800 mmSecondary Arm Length: 850 mmDrop Tube: 1600 mm with end 45 degree beveled MATERIAL:Supplier to specify (must be compatible with service fluids asspecified above), preferably Aluminum.Seal Material: Supplier to specify, must be compatible with servicefluids as specified above). TESTING/ INSPECTION:a) Performance Test: Torsion spring balance adjustment to achieve perfect movements and checking of all planes of rotation for proper functioning.b) Hydrostatic Test: Testing up-to 1.5 times working pressure is required.c) Material certificates: Material Certificates according to EN10204-2.2 are required for all pressure containing parts.DOCUMENTATION:Within 10 Days after the receipt of P.O, contractor will send us a drawing for approval.At the time of delivery, supplier will provide following documents:- One set Test Certificate of performance and hydrostatic test.- Two sets As-Built Drawings.- One Set EN 10204-2.2 material certificate.- One set General Installation & maintenance Instructions DELIVERY PERIOD:16 weeks after issuance of purchase order/ LOI. Pervez BashirMatrix Automation & Control11-C, 32nd Street, Tauheed Commercial,Phase-5, DHA, Karachi- PakistanTel: +92-21-*******3Fax: +92-21-*******9Cell: +92-300-*******

Send Your Quotation To This Buyer

Scroll
* I am a Buyer / Seller
Please validate security
Complete the security check
* By joining ExportHub, I agree to Terms, Privacy Policy, IPR/DMCA Policy and Marketing Policy of ExportHub
ExportHub Virtual Expo
Scroll to Top

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.