Get Quick Quote From Supplier
Dear Sirs,for a project delivery at Chittagong Port (CPA) we are looking to hire qualified manpower, as well as different equipment.Therefore, we kindly ask you to offer said to us.In details, the following will be required:- Manpower1. Electrical engineers 2x, 10 hrs a day, 6 days a week, roughly 50 days2. Mechanical engineers 2x, 10 hrs a day, 6 days a week, roughly 50 daysNote: These workers should be able and willing to work on different things, too, such as paint jobs, Tyre fitter, fitters or simply as helpers in order to assist the main crew.- Equipment1. 3x Manlifter, self propelled, diesel engine powered, lifting height approx. 20m, operated by our crew for a period of approx 50-60 days2. 1x Forklift, 3ton (metric) lifting capacity, diesel engine powered, operated by our crew for a period of approx 50-60 days3. 1x Forklift, 5ton (metric) lifting capacity, diesel engine powered, operated by our crew for a period of approx 50-60 days4. 1x Mobile crane, lifting capacity 25 ton (Metric) incl. all lashing and lifting straps and chains for a period of approx 7-10 days5. 1x Mobile crane, lifting capacity 150 ton (Metric) incl. all lashing and lifting straps and chains for a period of approx 3-4 daysThe above mentioned durations are subject to change and depending on the daily progress of the total project.Please provide us with your best quote for the above required items and send it via e-mail (e-mail contact below)as soon as possible.Many thanks in advance for your efforts.Best regardsMichael KueblerProject ManagementProject ManagerTerex CranesT +49 (931) 2053-277F +49 (931) 2053-251M +49 (173) 3487-217E *******@*****.com