Entered incorrect captcha
div header bar

Buy Copper Cathode Scrap

  • Sourcing Country:SingaporeSingapore
  • Required Quantity: Ask From Buyer
  • Posted Date:15 Apr 2024
  • Expiry Date:29 May 2024
  • Buyer Name: Nitin
  • Usage:
    Ask From Buyer
  • Buying Frequency: One Time
  • Email:
    b****w****************m
  • Approx Order Value:
    Ask From Buyer
  • Quotations Received: 1 Quotes
  • Contact Number:
    6****2****4
  • FOB Price:
    Ask From Buyer
  • Time Left: 20 Days
  • Shipping Terms:
    Ask From Buyer
  • Payment Terms: T/T, LC, D/P, PayPal, Western Union
  • Preferred Supplier Country:ChinaChina

RFQ Description

Hi I am looking for Copper scrap millberry / copper cathodes.Here are the details :Company based in SINGAPOREemail: buildwellintlgmail.commobile/whats app: +65-***04Parity-delivery term: CIF AWSP / Singapore / EuropeMaterial packing: standard for cathodePayment: 100 % L/C at sight, irrevocable, transferable or TT after SGS inspection at destination portProposed payment procedure for DLC:1)When buyer receives from seller the suitable documentation (past performance) the Buyers Bank issues a RWA via MT799/ MT199 to issue the DLC via SWIFT MT700 to Seller Financial Bank.2)After receipt and authentication of the RWA, Seller Financial Bank confirms via MT199 / 700 readiness to receive the DLC via SWIFT MT 700 and readiness to issue the 2 %PB.3)When Buyer s bank receives documentation from upper point 2. the Buyer Bank issue the DLC irrevocable, non transferable, payable immediately with delivery of documents via SWIFT MT700 NON OPERATIVE from Singapore based bank to the Seller Financial Bank4)After receipt and authentication of DLC via SWIFT MT 700 Seller Bank issues 2% PB that will automatically activate the DLC (the PB must be valid for the same time as DLC), which becomes operative at your bank 5)Seller starts shipping and pays al/ local costs.6)The Seller delivers the COPPER CA THODE PLATES to the Place of Delivery Port. If goods are not shipped and delivered by the seller according to DLC the buyer cash in (activate) the 2% PB. The PB must be valid for the same time as DLC.7) The seller ensure all the documents to allow and enable the control of goods at unloading port by accredited institution SGS or equivalent payed by buyer (if seller want also he can order the control and pay for it). The issued suitable positive inspection certificate from accredited international institution at unloading port is sent to buyer and to seller and is basis for DLC payment.8)Seller now has all the documents required from DLC and he can deliver them on bank and DLC is payed.Parity-delivery term: CIF AWSP EU Material packing : standard for cathodePayment: 100 % L/C at sight, irrevocable, transferable or TT after SGS inspection at destination portRegardsNitin

Send Your Quotation To This Buyer

Scroll
ExportHub Virtual Expo
Scroll to Top

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.