Entered incorrect captcha
div header bar

Looking for francis turbine

  • Sourcing Country:NetherlandsNetherlands
  • Required Quantity: Ask From Buyer
  • Posted Date:15 Apr 2024
  • Expiry Date:03 Oct 2024
  • Buyer Name: nl info 101414
  • Usage:
    Ask From Buyer
  • Buying Frequency: One Time
  • Email:
    i****h*******************m
  • Approx Order Value:
    Ask From Buyer
  • Quotations Received: 1 Quotes
  • Contact Number:
    3****2**8
  • FOB Price:
    Ask From Buyer
  • Time Left: 158 Days
  • Shipping Terms:
    Ask From Buyer
  • Payment Terms: T/T, LC, D/P, PayPal, Western Union
  • Preferred Supplier Country:ChinaChina

RFQ Description

Dear company,Via Exporthub we were invited to requstyou for a quotation for water turbines.We request from you an preliminary offer for 5 systems based on:All systems: Q: 4.2 m3/s (quantity guaranteed, we are not allowed to take more water)Different Heads:Turbine 1 at inlet of turbine available Head 32.6 m (already included penstock losses)Turbine 2 at inlet of turbine available Head 10.56 m (already included penstock losses)Turbine 3 at inlet of turbine available Head 24 m (already included penstock losses)Turbine 4 at inlet of turbine available Head 14.4 m (already included penstock losses)Turbine 5 at inlet of turbine available Head 14.4 m (already included penstock losses)In the annex you see these values in calculation with the minimum expected output. (we can send annex when you give us your email adress)All turbines are in series as seen in the second annex canals and situation of each turbine are planned.We have a ppa (power purchase agreement) and the water rights with all permissions and an office close to the site in Asia.Feasibility study is executed.Regarding the electrical data: 60 Hz and transmission lines are 3.75 kV. Start of project in ¾ to 1 year at site.Harbour is close to the site and good roads are available until the site location Penstock diameters will be tuned in close co-operation.Beside this we have 6 sites in study which are almost ready for installation.We expect from you an specified offer in prices and dimensions with the items (the total components in the power house):1.Turbine with governor (also type of turbine)2.Mechanical transmission3.Generator (normal 3 phase at site: 400 VAC 60 Hz)4.Needed control cabinets We need in regard of the progress of the project a preliminary estimation within one week.With kind regards,H-Energiesystemen B.V.,Dipl. Ing. F.A.J.R. van t HulDipl. Ing. J.F. van ‘t Hul+31 (0)321 ***www.h-energiesystemen.comskype: frans.van.t.hul

Send Your Quotation To This Buyer

Scroll
ExportHub Virtual Expo
Scroll to Top

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.