Get Quick Quote From Supplier
Dear Sir,We have a requirement of following equipment:S. #DescriptionQty1.Equipment Name: Main Stop Valve.Drawing No. B902.30.41-1/2~2/2E01Manufacturer/Supplier: Shanghai Electric Power Generation Equipment Co. Ltd.Spares Required:1.1Shaft LH, DWG # B902.30.41.55G0101 Nos.1.2Shaft RH, DWG # B902.30.42.04G0101 Nos.1.3Spherical Washer, DWG # B902.30.41.5302 Nos.2.Equipment Name: Steam TurbineDocument No: PC-2-31001-001-SHTP-44-EHManufacturer/Supplier: Shanghai Electric Power Generation Equipment Co. Ltd.Spares Required:2.1Special Screw LP Heating Bolt Cap, DWG # W1073.1-M27 X1410 Nos.2.2HP Special Washer, DWG # A156.24.41.04150 Nos.2.3Over Speed Trip Relay, DWG # A156.31.02.3601 Nos.3.Equipment Name: Cross Over PipingDWG # B902.60.52.1/1E01Manufacturer/Supplier: Shanghai Electric Power Generation Equipment Co. Ltd.Spares Required:3.1Gasket 1015 × 930 × 4.508 Nos.4.Equipment Name: Main Oil Pump of TurbineDWG # B902.70.01.1/1E01Manufacturer