Get Quick Quote From Supplier
In the end our project is processing. We are building the construction and ordered the boiler.Now we work with you on the turbine.Our boiler data as follow:Capacity 20TPHWorking pressure 45 barOutlet Super heated steams temperature: 450oC+-5oCPls give us the offer of the following turbine:Inlet steam temperature: 440oCCapcity: 20TPHExtraction pressure: 8barExtraction capacity: 8TPH to 10TPHPls give us the offer as soon as possible.Note: Included the condensate heat exchanger, cooling tower.Mr.Quang extraction turbine ,steam turbine steel pipes(Standar ASTM A106) and fittings;valves;rockwool pipes.