Entered incorrect captcha
div header bar

ABB TU891

  • Sourcing Country:ChinaChina
  • Required Quantity: Ask From Buyer
  • Posted Date:28 Mar 2024
  • Expiry Date:12 Jun 2024
  • Buyer Name: Zhang Jia
  • Usage:
    Ask From Buyer
  • Buying Frequency:
    Ask From Buyer
  • Email:
    z****n*********m
  • Approx Order Value:
    Ask From Buyer
  • Quotations Received: 5 Quotes
  • Contact Number:
    1****0****5
  • FOB Price:
    Ask From Buyer
  • Time Left: 44 Days
  • Shipping Terms: EXW
  • Payment Terms:
    Ask From Buyer
  • Preferred Supplier Country:ChinaChina

RFQ Description

The peak line-to-line voltage at the motor terminals generated by the drive as well asthe voltage rise time depend on the cable length. The requirements for the motorinsulation system given in the table are “worst case require-ments coveringinstallations with 30 metre and longer cables. The rise time can be calculated asfollows: Read ÛLL and du/dt from the diagrams below. Multiplythe values of the graph by the supply voltage (UN). In case of drives with an IGBTsupply unit or resistor braking, the ÛLL and du/dt values are approximately 20 %higher.

Send Your Quotation To This Buyer

Scroll
ExportHub Virtual Expo
Scroll to Top

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.