Get Quick Quote From Supplier
Cambridge Energy Waste Management, Ltd.PO Box 1616 Deerfield Beach, FL 33443 (832) 212-7327 FAX (832) 203-6377 Email: *@********************man1651Chicago, Il & Bangladesh I am looking for 2 new power plants both 50HZ Plant 1225 MW combined Cycle Newa)Capacity: 225 MW±10% b)Configuration: 2:2:1 Combined cycle Power Station c)Fuel: Natural Gas d)Cooling water system: Once Through Condenser Cooling System e)Source of water: Canal with with water next to site f)Power Evacuation System: 230 kV single bus sub-station in Power Plant site with two (02) g)nos. spare bay without equipment. PGCB will connect power plant sub-station Grid Sub-station (new construction) by two (2) nos. of 230 kv lines. h)Need an EPC Contractor with the equipment with proven Experience do the work and able to put a completion bond.i)Must be completed in 1 to 3 yearsPlant 2150 MW Gas Turbinea)Need new equipment and preferable GE b)Must have EPC experience to complete the work.c)Natural Gas is fuel Sourced)Power Evacuation System: 230 kV single bus sub-station in Power Plant site with two (02) e)nos. spare bay without equipment. PGCB will connect power plant sub-station with Grid Sub-station (new construction) by two (2) nos. of 230 kv lines. f)Completion 1 to 2 years I will supply complete details to qualified firmPeter PartosPeter Partos ChairmanCambridge Energy Waste Management, LTDDivision of Cambridge Financial Group 540 Frontage Road, Suite 3345 Northfield, Illinois 60093(847) 784-0035 FAX (847) 784-0038Florida OfficeP.O. Box 1616 Deerfield Beach, FL 33443(832) 212-7327 FAX (832) 203-6377Email: ppartos